Organizational Models for Managing Parallel Construction Projects in Regional Development
Abstract
This article addresses the problem of managing parallel construction projects within the context of regional development. The study was conducted as a systematic review of scientific publications and aims to identify organizational mechanisms that ensure the coordinated implementation of a large number of interrelated construction projects. Particular attention is given to the transformation of management challenges when moving from individual projects to construction programs and project portfolios. A comprehensive analysis of contemporary approaches to resource coordination, project management office organization, portfolio management, and digital integration of construction processes was carried out. The findings indicate that as the number of simultaneously implemented projects increases, the primary management challenge gradually shifts from the level of individual projects to the level of inter-project coordination. It is demonstrated that neither complete project autonomy nor rigid centralized control can fully address the complexities of a multi-project environment. Based on the analysis, the author developed the Hybrid Multi-Site Construction Management Model, which combines centralized construction portfolio coordination, autonomous site-level management, and a unified information environment. The proposed model extends existing perspectives on organizational principles for multi-project construction management and may be applied in the planning and implementation of regional development programs. The article may be of interest to construction company executives, project management professionals, regional development program managers, and researchers in the field of construction management.
References
Antoniou, F., & Tsavlidou, E. (2025). Ranking public infrastructure project success using multi-criteria analysis. Buildings, 15(16), 2807. https://doi.org/10.3390/buildings15162807
Berge, T. T., Hussein, B., & Haaskjold, H. (2025). A new holistic framework for megaproject portfolio success. Project Leadership and Society, 6, 100190. https://doi.org/10.1016/j.plas.2025.100190
Chen, Y., Yao, F., & Zhuang, T. (2025). Deciphering the risk of area-wide coordinated urban regeneration in Chinese small cities from the project portfolio perspective: A case study of Yancheng. Buildings, 15(6), 983. https://doi.org/10.3390/buildings15060983
Cleary, J. P., & Lamanna, A. J. (2022). Correlation of construction performance indicators and project success in a portfolio of building projects. Buildings, 12(7), 957. https://doi.org/10.3390/buildings12070957
Ding, F., Liu, M., Hsiang, S. M., Hu, P., Zhang, Y., & Jiang, K. (2024). Duration and labor resource optimization for construction projects: A conditional-value-at-risk-based analysis. Buildings, 14(2), 553. https://doi.org/10.3390/buildings14020553
Garcés, G., Forcael, E., Osorio, C., et al. (2025). Systematic review of Lean Construction: An approach to sustainability and efficiency in construction management. Journal of Infrastructure Preservation and Resilience, 6, 6. https://doi.org/10.1186/s43065-025-00119-1
Gómez-Cabrera, A., León, L. C., Lopez, M. L., & Torres, A. (2025). Analyzing time and cost deviations in educational infrastructure projects: A data-driven approach using Colombia’s public data platform. Buildings, 15(19), 3505. https://doi.org/10.3390/buildings15193505
Jajac, N. (2025). Decision support for infrastructure management of public institutions. Sustainability, 17(5), 2096. https://doi.org/10.3390/su17052096
Jiang, Y., Su, S., Zhao, S., Zhong, R. Y., Qiu, W., Skibniewski, M. J., Brilakis, I., & Huang, G. Q. (2024). Digital twin-enabled synchronized construction management: A roadmap from Construction 4.0 towards future prospect. Digital Building Engineering, 2, 100512. https://doi.org/10.1016/j.dibe.2024.100512
Junussova, T., Nadeem, A., Kim, J. R., Azhar, S., Khalfan, M., & Kashyap, M. (2022). Sustainable construction through resource planning systems incorporation into building information modelling. Buildings, 12(10), 1761. https://doi.org/10.3390/buildings12101761
Keleş, A. E., Gülek, G. G., & Górecki, J. (2025). Use of project management knowledge areas in civil infrastructure projects: Implications for sustainability assessment and risk analysis. Sustainability, 17(20), 9129. https://doi.org/10.3390/su17209129
León-Romero, L. P., Aguilar-Fernández, M., Luque-Sendra, A., Zamora-Polo, F., & Francisco-Márquez, M. (2024). Characterization of the information system integrated to the construction project management systems. Heliyon, 10(11), e31886. https://doi.org/10.1016/j.heliyon.2024.e31886
Machado, F., Duarte, N., & Amaral, A. (2023). Project management maturity in renovation and remodelling construction firms. Buildings, 13(2), 557. https://doi.org/10.3390/buildings13020557
Qadir, S., Alawag, A. M., Baarimah, A. O., et al. (2026). The role of digital technologies in enhancing construction project management. Scientific Reports, 16, 1486. https://doi.org/10.1038/s41598-025-31955-6
ISSN 